Nissan 200SX S13 silhouetteS13

SUPER MULTIPLE JUNCTION (S.M.J.)

EL-107prose procedure

REMOVAL

  1. 1
    Remove fuse block retaining screws to gain access to S.M.J.
  2. 2
    Slide fuse block to the side, and remove S.M.J. retaining bolts to detach S.M.J.

INSTALLATION

  1. 1
    To install S.M.J., tighten bolts until orange "full-tight" mark appears and then retighten to specified torque as required.
    Illustration of S.M.J. unit showing 'Full-tight' mark location and torque specification callout for retaining bolts
    SEL422L
S.M.J. retaining bolt
3 - 5N·m

Search Manual

Search pages, specs, and procedures